Only good thing about 2020 was I got my first Z3 (unfortunately, the week before lockdown) but I did managed to get some jobs done on it.
Refurbished interior - new seat bushes, seat leather treated, seat belt clips renewed, new instrument light bulbs etc
Exterior - roof cleaned, dyed and waterproofed, new window fitted, new aerial grommet, door handle seals replaced, new tyres
Front suspension - new control arms, bushes, drop links, struts, refurb brake calipers, new brake pads, dust shields and steering (inner and outer) tie rods and new tyres all round.
New Stainless cat back exhaust.
Rear suspension - new struts. Trailing arms, ARB and spare wheel carrier, wire brushed, rust treated, red oxide coated and finished with black hammerite.
Hopefully next year I will be able to get out and do some driving, as was my original plan.
Refurbished interior - new seat bushes, seat leather treated, seat belt clips renewed, new instrument light bulbs etc
Exterior - roof cleaned, dyed and waterproofed, new window fitted, new aerial grommet, door handle seals replaced, new tyres
Front suspension - new control arms, bushes, drop links, struts, refurb brake calipers, new brake pads, dust shields and steering (inner and outer) tie rods and new tyres all round.
New Stainless cat back exhaust.
Rear suspension - new struts. Trailing arms, ARB and spare wheel carrier, wire brushed, rust treated, red oxide coated and finished with black hammerite.
Hopefully next year I will be able to get out and do some driving, as was my original plan.