- Joined
- Dec 8, 2011
- Points
- 145
I could understand the logic if only certain approved people could do the repair, but I can see this as the thin edge of a very thick wedge.
Wheels today (or 20th May), structural body work tomorrow, non-structural bodywork the day after.
That will write-off all Z3s that have had the boot floors welded.
Wheels today (or 20th May), structural body work tomorrow, non-structural bodywork the day after.
That will write-off all Z3s that have had the boot floors welded.